PROJECT OVERVIEW

Eraring Power Station is Australia’s largest – providing 25% of NSW’s power requirements. Bowsers was engaged to audit and replace over 200 fire dampers under strict safety and operational protocols, ensuring compliance with the Australian Standards and Building Codes.

Services Offered

Bowsers audited the existing fire dampers onsite at Eraring Power Station. It was found that 200+ existing multi-blade fire dampers required replacement with new galvanised steel curtain fire dampers.

Solutions Offered

Bowsers’ onsite team worked closely with Origin Energy’s personnel to arrange the fire damper works so as to not disrupt the operations of the power station.

Project Challenges

It was imperative to project success that Bowsers meet Origin Energy’s strict safety protocols, procedures and site requirements.

Overall Outcome

This project was a testament of Bowsers’ ability to carry out high-quality mechanical fire damper installation without disrupting day to day operations of the Eraring Power Station. The fire dampers were also painted, labelled, and documented as per our Origin Energy’s service requirements.