Eraring Power Station
Industrial
Eraring Power Station is Australia’s largest – providing 25% of NSW’s power requirements. Bowsers was engaged to audit and replace over 200 fire dampers under strict safety and operational protocols, ensuring compliance with the Australian Standards and Building Codes.
Industrial
August 2015
Eraring Power Station, Rocky Point Road, Eraring
Eraring Power Station
$1,000,000
Bowsers audited the existing fire dampers onsite at Eraring Power Station. It was found that 200+ existing multi-blade fire dampers required replacement with new galvanised steel curtain fire dampers.
It was imperative to project success that Bowsers meet Origin Energy’s strict safety protocols, procedures and site requirements.
Bowsers’ onsite team worked closely with Origin Energy’s personnel to arrange the fire damper works so as to not disrupt the operations of the power station.
This project was a testament of Bowsers’ ability to carry out high-quality mechanical fire damper installation without disrupting day to day operations of the Eraring Power Station. The fire dampers were also painted, labelled, and documented as per our Origin Energy’s service requirements.
P.O. Box 875,
Matraville NSW 2036
South-East Queensland
Unit 4, 18 Blanck Street
Ormeau Qld 4208