Bushfire Roof System

Why Bowsers

Fire rating specialist

Bowsers has been operating in Australia for more than 100 years. The company provides fire rating services to the building maintenance and construction sectors.

Bowsers specialises in the assessment and installation of passive fire rating systems and employs over 50 people in NSW & Queensland.

Bushfire roof experience

Bowsers has supplied and installed more than 100 bushfire roof systems across NSW.

bowsers-res-1

We are the only company that offers the flexible options of

  • a complete fixed price supply & installation package inclusive of technical support and a post installation compliance certificate
  • supply of materials only for more experienced builders with the support of a detailed installation manual along with access to our technical team

With Bowsers you get peace of mind and a complete package. We cover all bushfire prone areas in NSW.

bowsers-res-2

Our bushfire roof system was used for the Ku-ring-gai State Emergency Services and Ku-ring-gai Bush Fire Brigade facilities.

bushfire-res-kuringai

Bushfire Zone Roof Issues

Protecting your biggest asset

The increased occurrence of bushfires is now part of everyday life in Australia. Protecting property in extreme conditions, where temperatures can exceed 1500 degrees celsius, is now possible with our Bushfire Resistant Roof System.

Our system has been extensively tested to meet and comply with Australian standards and the relevant building codes connected to building in bushfire prone regions.

bowsers-header-bushfire

What to look for in a bushfire roof system

During a bushfire emergency, ember attack from wind-driven embers is the greatest threat to property. Research of previous bushfire events has found that the most property loss has come from ember attack and not direct contact with flames or radiant heat. When choosing a bushfire roof system for your home, look for roof systems that are fully encapsulated from ember attack. Look for non-combustible, non-smouldering products.

bowsers-bushfire-2

In the event of an emergency, the homeowner or Fire Services may need to soak the roof area of a house. Although compliant for such an event, many roof systems will swell or deteriorate and possibly need replacing making for an inconvenient and expensive exercise.

Some bushfire roofing system designs are specifically for metal roofs, while others are more suitable for tiled finishes. When choosing a system, be aware of design limitations or alternatively select a system that is flexible enough to provide options for multiple finishes.

The Bowsers bushfire roof system is designed to meet all the criteria above

  • resists ember attack
  • maintains structural integrity when submersed
  • appropriate for both tiled and metal roof finishes

Stringent compliance requirements

The Australian standard for building in bushfire areas is AS3959. This is only a minimum standard of construction.

In NSW, compliance requirements are significantly more rigorous.

For Flame Zone areas in NSW (BAL FZ), the roof system must comply with AS1530.8.2 along with site specific development consent requirements as specified by the relevant council or Rural Fire Service.

It is important to note that Section 9 of AS3959 is not applicable in NSW, hence some systems designed to meet this standard will not comply with AS1530.8.2.

For more information click here.

Regardless of qualifications, it can be confusing for any inexperienced professional to navigate the stringent requirements within NSW in conjunction with site specific requirements for a particular project.

Bowsers have dedicated technical staff with the relevant experience to provide support and advice to builders, specifiers, architects and owners. This support can assist:

  • understand system design requirements to attain certification
  • understand cost implications of attaining compliance
  • improve or reconfigure construction methodology to minimise cost and time while still attaining certification

Converting compliance into a practical building system

At Bowsers we are able to offer a fully compliant solution for all BAL levels in all States and territories.

Our solutions are backed up by offering an inspection compliance certificate of the installed system on completion.

For owner builders or home builders we offer a comprehensive installation manual which includes instructions, drawings and photos along with phone support of our technical team.

bowsers-res-4

Our services include:

  • evaluation and measurement of your drawings and take-offs
  • supply only of all materials (normally allowing additional 10% for site cutting)
  • compliance inspection and certification (for supply only)
  • supply and install of complete system (includes compliance certification)

bowsers-bal-table

 

 

 

Bowsers System Overview

Highlights

  • Cost effective solution
  • Bowsers installation certificate on completion (if installed by Bowsers)
  • Tested & compliant to (AS 1530: 8.2) for colorbond & tile roofs
  • Product is non-combustible per BCA requirements
  • NATA tested system certificates (AS 1583. 8.2)
  • Valleys and eaves are triple layered for added protection
  • Applicable for both tiled and metal roof finishes
  • A dedicated technical team for specific project advice

bowser-res-5

Our dedicated technical team ensure you get the right advice and support to navigate the relevant BAL compliance requirements that govern the build solution required for your project. Contact us at bushfire@bowsers.com.au to discuss your project.

Safety, price and practicality

Our system offers an extremely cost effective solution compared to other less effective products whilst offering best in class compliance (AS1530.8.2) to the highest BAL rating.

Our system has zero timber/wood products in its manufacture and therefore is 100% non-combustible and non-smouldering.

The product is also impervious to moisture and drenching of water. In the event of the occupant or the Fire Services soaking the roof during a bushfire emergency our system maintains structural integrity and as such will not swell or deteriorate, hence will not need replacing. Our system will retain up to 95% of its physical strength after a major saturation.

Double or triple layered protection

Our fully encapsulated roof system is made from a cement bound matrix board that forms a monolithic core protecting the property.

This product is non-combustible, non-smouldering and cannot flame.

As wind-driven ember attack is seen as the greatest threat to property we offer double & triple layer protection to the vulnerable roof areas of eaves, hips and valleys to protect against wind-driven embers entering the roof space.

The photos below highlight the care we take to these areas:

bowsers-res-6
Eaves detail to show overlapping of the products to prevent Ember Ingress

In addition to the extra layers we coat joints with a polyurethane fire rated mastic sealant.

Eaves Detail with Polyurethane mastic on the joints
Eaves detail with triple layering

The polyurethane fire rated mastic (see photo) further protects from ember ingress.

Polyurethane fire mastic
Polyurethane fire mastic

bowsers-res-7

System materials overview

The Bowsers bushfire roof system utilises a cement bound matrix board. This low energy environmentally friendly manufacturing process makes excellent boards that offer superior fire resistance and exemplary strength, robustness and performance.

bowsers-res-promatect

The board is not classified as a dangerous substance so therefore no special requirements are needed for installation. The boards can be worked with conventional powered woodworking equipment or hand tools. We do recommend using diamond tipped blades or hardened teeth on hand saws.

bowsers-res-8

Bowsers’ bushfire resistant roof system provides a one stop shop solution for:

bal-grid2

Complete Solution – Supply & Installation

Great for owner builders

For builders or owner builders we offer a fixed price comprehensive supply and installation option that includes final inspection and certificate to meet the relevant Australian standard.

bowsers-res-9

Process overview

Step 1 – Initial consultation

Client makes contact with our specialist bushfire roof technical support and audit department. During this stage we will discuss the requirements of the project including the BAL rating, current roof system specifications, build stage and any other relevant factors. If required, Bowsers can interact with council or other professionals to understand specific project issues. Begin by sending us your drawings to bushfire@bowsers.com.au.

Step 2 – Quote submission

Client submits detailed drawings and relevant documentation to our technical and audit team for fixed price quoting. Any omissions from the fixed price are clearly documented. The quote is valid for 30 days.

Step 3 – Acceptance of quote

Client liaises with the Bowsers project team to ensure project schedules are managed within site requirements. Payments are made by client as per Bowsers standard condition of sale.

Step 4 – Materials delivery and site works

Bowsers commence work on site. Works for typical domestic projects are normally complete in 2-4 weeks.

bowsers-res-10

Step 5 – Completion and certification

One of Bowsers’ technical specialists will attend site to review and inspect the finished roof. When specifications are met, a Compliance Certificate will be issued for the works. This certificate is then used for submission to council and the relevant Fire Service for records management.

bowsers-cert-compliance

Peace of mind with a Fixed Price Guarantee

  • Cost effective solution
  • Bowsers installation certificate on completion (Bowsers installion)
  • Tested & compliant to (AS 1530: 8.2) for colorbond & tile roofs
  • Product is non-combustible per BCA requirements
  • NATA tested system certificates (AS 1583. 8.2)
  • Valleys and eaves are triple layered for added protection
  • Joints are sealed using our Fireban compound

Materials Supply and Certification

Great for builders

Experienced builders may choose to install the roof themselves and we provide technical advice along with a comprehensive installation manual to assist with the process.

bowser-res-11

Process overview:

Step 1 – Initial consultation

Client makes contact with our specialist bushfire roof technical support and audit department. During this stage we will discuss the requirements of the project including the BAL requirements, current roof system specifications, build stage and any other relevant factors. If required, Bowsers may interact with council or other professionals to understand specific project issues. Begin by sending us your drawings to bushfire@bowsers.com.au.

Step 2 – Quote submission

Client submits detailed drawings and relevant documentation to our technical and audit team for materials quoting. Typically an additional allowance of 10% is made for site wastage. The quote is valid for 30 days.

Step 3 – Acceptance of quote

Once accepted the client issues a purchase order for 100% of the material value.

Step 4 – Materials delivery

Materials are delivered to site according to builders timing requirements. All materials are weather & direct sunlight resistant during installation.

Step 5 – Works by builder or owner builder

The designated builder undertakes the works. No special tools are required for installation of the system. A detailed installation manual is provided, however Bowsers’ technical team are available by phone should further support be required.

Step 6 – Certification

If Bowsers is to supply certification, one of Bowsers’ technical specialists will attend site to review and inspect the finished roof. If all specifications are met, a Compliance Certificate will be issued for the works. This certificate is then used for submission to council and the relevant Fire Service for records management. In the event that the inspector finds any issues or reasons for non-compliance, responsibility resides with the designated builder. Subsequent call out fees shall apply for re-inspection by Bowsers’ technical team.

bowsers-cert-compliance

Best of Breed

 

best-of-breed

  • Case Study

    Retirement Village, Belrose NSW

    A reputable building company contacted Bowsers during the early build stages of a community hall extension.

    view more
  • Case Study

    SES & RFS Headquarters Project

    Bowsers Fire Protection supplied and certified the Promatect BALFZ roof system to the new SES and RFS Headquarters in early 2013.

    view more
  • Case Study

    Project Home Builders, NSW

    Bowsers assists project home builders from the early stages of BAL FZ project estimating, prior to clients receiving their overall … “Project Home Builders, NSW”

    view more